SciELO - Scientific Electronic Library Online

 
vol.10 issue1PETROFACIES AND DIAGENETIC PROCESSES OF LA VICTORIA FORMATION (EARLY MIOCENE), DINA OIL FIELD, UPPER MAGDALENA VALLEY BASIN, COLOMBIA.ORIGIN OF A DOUBLE FOREARC BASIN: THE EXAMPLE OF THE TUMACO - MANGLARES BASIN, NORTHWESTERN SOUTHAMERICA author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • On index processCited by Google
  • Have no similar articlesSimilars in SciELO
  • On index processSimilars in Google

Share


CT&F - Ciencia, Tecnología y Futuro

Print version ISSN 0122-5383On-line version ISSN 2382-4581

Abstract

VASQUEZ-CAPACHO, John-William; PEREZ-ZUNIGA, Gustavo; MUNOZ, Yecid  and  OSPINO, Adalberto. AN ADDITIONAL LAYER OF PROTECTION THROUGH SUPERALARMS WITH DIAGNOSIS CAPABILITY. C.T.F Cienc. Tecnol. Futuro [online]. 2020, vol.10, n.1, pp.45-66. ISSN 0122-5383.  https://doi.org/10.29047/01225383.168.

An alarm management methodology can be proposed as a discrete event sequence recognition problem where time patterns are used to identify the process safe condition, especially in the start-up and shutdown stages. Industrial plants, particularly in the petrochemical, energy, and chemical sectors, require a combined approach of all the events that can result in a catastrophic accident. This document introduces a new layer of protection (super-alarm) for industrial processes based on a diagnostic stage. Alarms and actions of the standard operating procedure are considered discrete events involved in sequences, where the diagnostic stage corresponds to the recognition of a special situation when these sequences occur. This is meant to provide operators with pertinent information regarding the normal or abnormal situations induced by the flow of alarms. Chronicles Based Alarm Management (CBAM) is the methodology used to build the chronicles that will permit to generate the super-alarms furthermore, a case study of the petrochemical sector using CBAM is presented to build the chronicles of the normal startup, abnormal start-up, and normal shutdown scenarios. Finally, the scenario validation is performed for an abnormal start-up, showing how a super-alarm is generated.

Keywords : Alarm management; Protection layers; Safe process; Diagnosis; Super-alarm.

        · abstract in Spanish     · text in English     · English ( pdf )