SciELO - Scientific Electronic Library Online

 
vol.41 issue3Batch Conversion of Methane to Methanol Using Copper Loaded Mordenite: Influence of the Main Variables of the ProcessDesign of Comminution Plants in the Ceramic Industry Using a Simulation-based Optimization Approach author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • On index processCited by Google
  • Have no similar articlesSimilars in SciELO
  • On index processSimilars in Google

Share


Ingeniería e Investigación

Print version ISSN 0120-5609

Abstract

PESSOA, Alcineide et al. Cost Forecasting of Public Construction Projects Using Multilayer Perceptron Artificial Neural Networks: A Case Study. Ing. Investig. [online]. 2021, vol.41, n.3, e205.  Epub Aug 20, 2021. ISSN 0120-5609.  https://doi.org/10.15446/ing.investig.v41n3.87737.

The execution of public sector construction projects often requires the use of financial resources not foreseen during the tendering phase, which causes management problems. This study aims to present a computational model based on artificial intelligence, specifically on artificial neural networks, capable of forecasting the execution cost of construction projects for Brazilian educational public buildings. The database used in the training and testing of the neural model was obtained from the online system of the Ministry of Education. The neural network used was a multilayer perceptron as a backpropagation algorithm optimized through the gradient descent method. To evaluate the obtained results, the mean absolute percentage errors and the Pearson correlation coefficients were calculated. Some hypothesis tests were also carried out in order to verify the existence of significant differences between real values and those obtained by the neural network. The average percentage errors between predicted and actual values varied between 5% and 9%, and the correlation values reached 0,99. The results demonstrated that it is possible to use artificial intelligence as an auxiliary mechanism to plan construction projects, especially in the public sector.

Keywords : public undertakings; costs; artificial neural network.

        · abstract in Spanish     · text in English     · English ( pdf )