SciELO - Scientific Electronic Library Online

 
vol.22 número4Temporal-spatial characteristics and path analysis of maritime cyclones in Guangdong coastal areas in the South China SeaStudy on the relationship between multi-stage strike-slip mechanism and basin evolution in Fangzheng fault depression índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Não possue artigos similaresSimilares em SciELO
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Earth Sciences Research Journal

versão impressa ISSN 1794-6190

Resumo

SUN, Hui et al. High-precision Joint 2D Traveltime Calculation for Seismic Processing. Earth Sci. Res. J. [online]. 2018, vol.22, n.4, pp.327-334. ISSN 1794-6190.  https://doi.org/10.15446/esrj.v22n4.77362.

Fast Marching Method (FMM) boasts high calculation efficiency and strong adaptability and stability while being applied to seismic traveltime. However, when it is applied to the largescale model, the calculation precision of FMM is insufficient. FMM has poor calculation precision near the source, which is an essential reason for the low accuracy of the whole algorithm. This paper puts forward a common traveltime calculation method to address the problem. Wavefront Construction (WFC) with a relatively high calculation accuracy rather than FMM is adopted for calculation of the grid nodes’ traveltime near the source. After that, FMM is used to calculate the seismic traveltime in the remaining area. Joint traveltime calculation method greatly improves the calculation accuracy of the source’s surrounding area and the calculation accuracy of FMM. According to the new method, FMM is still adopted for the calculation of most grid nodes in the model, so the high calculation efficiency of FMM is maintained. Multiple numerical models are utilized to verify the above conclusions in the paper.

Palavras-chave : Seismic Imaging; Traveltime calculation; Fast Marching Method; Wavefront Construction; Seismic Processing.

        · resumo em Espanhol     · texto em Inglês     · Inglês ( pdf )